| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Rizki civil engineering | 09*7**2****14**0 | Rp. 89.981.169,51 | Rp. 89.981.169,51 | Rp. 89.981.169,51 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Rizki civil engineering | 09*7**2****14**0 | Rp. 89.981.169,51 | Rp. 89.981.169,51 | Rp. 89.981.169,51 |