| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | BANYU PUTIH ENGINEERING | 10*0**0****89**5 | Rp. 137.526.808,46 | Rp. 137.526.808,46 | Rp. 137.515.708,46 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | BANYU PUTIH ENGINEERING | 10*0**0****89**5 | Rp. 137.526.808,46 | Rp. 137.526.808,46 | Rp. 137.515.708,46 |