| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TUAN MUDA CONSTRUCTION | 10*0**0****72**1 | Rp. 204.206.767,40 | Rp. 204.206.767,40 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TUAN MUDA CONSTRUCTION | 10*0**0****72**1 | Rp. 204.206.767,40 | Rp. 204.206.767,40 |