| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SAHARA ENGINEERING | 08*3**7****05**0 | Rp. 99.234.000,00 | Rp. 99.234.000,00 | Rp. 97.802.100,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SAHARA ENGINEERING | 08*3**7****05**0 | Rp. 99.234.000,00 | Rp. 99.234.000,00 | Rp. 97.802.100,00 |