| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CV KARYA UTAMA MANDIRI | 00*7**1****54**0 | Rp. 197.184.980,17 | Rp. 197.184.980,17 | Rp. 197.184.980,17 | ![]() |
![]() |
|||||
| 2 | cv. aditama tracont | 02*0**2****54**0 | Rp. 198.576.229,58 | Rp. 198.576.229,58 | ||||||||
| 3 | CV. TIRTOYOSO | 03*4**4****23**0 | Rp. 199.168.312,95 | Rp. 199.168.312,95 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
