| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TEGAR DARMA KONSTRUKSI | 02*2**0****57**0 | Rp. 196.321.310,47 | Rp. 196.321.310,47 | Rp. 196.321.310,47 | ![]() |
||||||
| 2 | AIGA KANA | 06*4**3****57**0 | Rp. 197.380.867,53 | Rp. 197.380.867,53 | Rp. 197.380.867,53 | |||||||
| 3 | GADING ADINATA | 04*1**4****57**0 | Rp. 198.274.958,62 | Rp. 198.274.958,62 | Rp. 198.274.958,62 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
