| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | My Team Consultan Engineering | 10*1**1****78**2 | Rp. 96.750.375,00 | Rp. 96.750.375,00 | Rp. 96.459.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | My Team Consultan Engineering | 10*1**1****78**2 | Rp. 96.750.375,00 | Rp. 96.750.375,00 | Rp. 96.459.000,00 |