| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV TUANANE ENGINEERING | 09*6**5****42**0 | Rp. 24.941.109,48 | Rp. 24.941.109,48 | Rp. 24.941.109,48 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV TUANANE ENGINEERING | 09*6**5****42**0 | Rp. 24.941.109,48 | Rp. 24.941.109,48 | Rp. 24.941.109,48 |