| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TUANANE ENGINEERING | 09*6**5****42**0 | Rp. 99.207.754,05 | Rp. 99.207.000,00 | Rp. 99.201.144,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TUANANE ENGINEERING | 09*6**5****42**0 | Rp. 99.207.754,05 | Rp. 99.207.000,00 | Rp. 99.201.144,00 |