| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SANTOSA CONSTRUCTION | 09*6**1****09**0 | Rp. 185.761.973,07 | Rp. 185.761.973,07 | Rp. 185.452.147,33 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SANTOSA CONSTRUCTION | 09*6**1****09**0 | Rp. 185.761.973,07 | Rp. 185.761.973,07 | Rp. 185.452.147,33 |