| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 47.064.000,00 | Rp. 47.064.000,00 | Rp. 47.064.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 47.064.000,00 | Rp. 47.064.000,00 | Rp. 47.064.000,00 |