| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV TIFA ENGINEERING | 00*3**1****03**0 | Rp. 74.578.902,00 | Rp. 74.578.902,00 | Rp. 74.412.180,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV TIFA ENGINEERING | 00*3**1****03**0 | Rp. 74.578.902,00 | Rp. 74.578.902,00 | Rp. 74.412.180,00 |