| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | MUBARAK ENGINEERING | 04*9**4****47**0 | Rp. 182.732.943,18 | Rp. 182.732.943,18 | Rp. 182.732.943,18 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | MUBARAK ENGINEERING | 04*9**4****47**0 | Rp. 182.732.943,18 | Rp. 182.732.943,18 | Rp. 182.732.943,18 |