| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. EHSAN ENGINEERING CONSULTANT | 9*.1**.9**.*-*02.**0 | Rp. 28.722.539,82 | Rp. 28.722.539,82 | Rp. 28.694.789,82 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. EHSAN ENGINEERING CONSULTANT | 9*.1**.9**.*-*02.**0 | Rp. 28.722.539,82 | Rp. 28.722.539,82 | Rp. 28.694.789,82 |