| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SAKA ENGINEERING | 09*1**4****26**0 | Rp. 28.797.586,92 | Rp. 28.797.000,00 | Rp. 28.700.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SAKA ENGINEERING | 09*1**4****26**0 | Rp. 28.797.586,92 | Rp. 28.797.000,00 | Rp. 28.700.000,00 |