| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. ARTARA TAKA ENGINEERING | 10*0**0****23**9 | Rp. 28.471.500,00 | Rp. 28.471.500,00 | Rp. 28.360.500,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. ARTARA TAKA ENGINEERING | 10*0**0****23**9 | Rp. 28.471.500,00 | Rp. 28.471.500,00 | Rp. 28.360.500,00 |