| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | PT. Bimata Karya Abadi | 06*4**9****04**0 | Rp. 280.198.651,78 | Rp. 280.198.651,78 | Rp. 280.053.694,86 | ![]() |
||||||
| 2 | CV. AA PUTRI | 09*6**9****44**0 | Rp. 280.325.278,41 | Rp. 280.325.278,41 | Rp. 280.290.333,53 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
