| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FM ENGINEERING | 09*7**8****08**0 | Rp. 178.833.523,08 | Rp. 178.833.000,00 | Rp. 178.278.523,08 | |
| 2 | CV. Alfin | 00*9**9****08**0 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FM ENGINEERING | 09*7**8****08**0 | Rp. 178.833.523,08 | Rp. 178.833.000,00 | Rp. 178.278.523,08 | |
| 2 | CV. Alfin | 00*9**9****08**0 |