| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MEUTUAH ENGINEERING | 8*.9**.3**.*-*01.**0 | Rp. 199.886.418,09 | Rp. 199.886.418,09 | Rp. 199.886.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MEUTUAH ENGINEERING | 8*.9**.3**.*-*01.**0 | Rp. 199.886.418,09 | Rp. 199.886.418,09 | Rp. 199.886.000,00 |