| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SHIN ENGINEERING KONSULTAN | 10*0**0****98**3 | Rp. 47.909.154,00 | Rp. 47.909.154,00 | Rp. 47.909.154,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SHIN ENGINEERING KONSULTAN | 10*0**0****98**3 | Rp. 47.909.154,00 | Rp. 47.909.154,00 | Rp. 47.909.154,00 |