| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. BIJE ENGINEERING CONSULTAN | 09*3**2****12**0 | Rp. 5.989.005,00 | Rp. 5.989.005,00 | Rp. 5.989.005,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. BIJE ENGINEERING CONSULTAN | 09*3**2****12**0 | Rp. 5.989.005,00 | Rp. 5.989.005,00 | Rp. 5.989.005,00 |