| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 2.999.204,46 | Rp. 2.999.204,46 | Rp. 2.841.489,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 2.999.204,46 | Rp. 2.999.204,46 | Rp. 2.841.489,00 |