| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FHM ENGINEERING | 08*5**7****17**0 | Rp. 55.794.906,28 | Rp. 55.794.906,28 | Rp. 55.794.906,28 | |
| 2 | CV. ADYATAMA ENGINEERING | 09*1**1****12**0 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FHM ENGINEERING | 08*5**7****17**0 | Rp. 55.794.906,28 | Rp. 55.794.906,28 | Rp. 55.794.906,28 | |
| 2 | CV. ADYATAMA ENGINEERING | 09*1**1****12**0 |