| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 9.975.911,88 | Rp. 9.975.911,88 | Rp. 9.758.351,88 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ADAM CIPTA ENGINEERING | 10*0**0****74**2 | Rp. 9.975.911,88 | Rp. 9.975.911,88 | Rp. 9.758.351,88 |