| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVAMPEK DUOSE ENGINEERING | 05*6**1****03**0 | Rp. 17.333.200,56 | Rp. 17.333.200,56 | Rp. 17.044.600,56 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVAMPEK DUOSE ENGINEERING | 05*6**1****03**0 | Rp. 17.333.200,56 | Rp. 17.333.200,56 | Rp. 17.044.600,56 |