| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CV.BATUBARA PRODUCTIOIN | 6*.7**.1**.*-*25.**0 | Rp. 127.905.300,00 | Rp. 127.905.300,00 | Rp. 127.905.300,00 | ![]() |
![]() |
|||||
| 2 | CV ANDOS RAP MAJU | 6*.1**.0**.*-*21.**0 | Rp. 127.998.540,00 | Rp. 127.998.540,00 | Rp. 127.998.540,00 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
