| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV IDEAR CIPTA ENGINEERING | 04*3**5****04**0 | Rp. 75.347.454,90 | Rp. 75.347.454,90 | Rp. 74.469.999,90 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV IDEAR CIPTA ENGINEERING | 04*3**5****04**0 | Rp. 75.347.454,90 | Rp. 75.347.454,90 | Rp. 74.469.999,90 |