| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. Cube Engineering | 00*1**2****01**0 | Rp. 8.464.416,00 | Rp. 8.464.416,00 | Rp. 8.400.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. Cube Engineering | 00*1**2****01**0 | Rp. 8.464.416,00 | Rp. 8.464.416,00 | Rp. 8.400.000,00 |