| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. GANEETA HANDARA KONSTRUKSI | 04*9**8****03**0 | Rp. 69.904.736,17 | Rp. 69.904.000,00 | Rp. 69.849.236,17 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. GANEETA HANDARA KONSTRUKSI | 04*9**8****03**0 | Rp. 69.904.736,17 | Rp. 69.904.000,00 | Rp. 69.849.236,17 |