| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Sarana Konstruksi Utama | 09*9**0****52**0 | Rp. 74.850.000,00 | Rp. 74.850.000,00 | Rp. 74.662.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Sarana Konstruksi Utama | 09*9**0****52**0 | Rp. 74.850.000,00 | Rp. 74.850.000,00 | Rp. 74.662.000,00 |