| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVSHOLTANAH KONTRUKSI | 02*7**5****33**0 | Rp. 189.255.000,00 | Rp. 189.255.000,00 | Rp. 189.032.815,74 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVSHOLTANAH KONTRUKSI | 02*7**5****33**0 | Rp. 189.255.000,00 | Rp. 189.255.000,00 | Rp. 189.032.815,74 |