| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVSHOLTANAH KONTRUKSI | 02*7**5****33**0 | Rp. 176.878.500,00 | Rp. 176.878.500,00 | Rp. 176.878.500,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVSHOLTANAH KONTRUKSI | 02*7**5****33**0 | Rp. 176.878.500,00 | Rp. 176.878.500,00 | Rp. 176.878.500,00 |