| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVTEKKO ENGINEERING | 06*4**4****25**0 | Rp. 29.907.840,00 | Rp. 29.907.840,00 | Rp. 29.774.640,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVTEKKO ENGINEERING | 06*4**4****25**0 | Rp. 29.907.840,00 | Rp. 29.907.840,00 | Rp. 29.774.640,00 |