| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVTEKKO ENGINEERING | 06*4**4****25**0 | Rp. 37.400.062,50 | Rp. 37.400.062,50 | Rp. 37.178.062,50 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CVTEKKO ENGINEERING | 06*4**4****25**0 | Rp. 37.400.062,50 | Rp. 37.400.062,50 | Rp. 37.178.062,50 |