| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV.TEKKO ENGINEERING | 6*.4**.4**.*-*25.**0 | Rp. 11.823.165,00 | Rp. 11.823.165,00 | Rp. 11.739.915,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV.TEKKO ENGINEERING | 6*.4**.4**.*-*25.**0 | Rp. 11.823.165,00 | Rp. 11.823.165,00 | Rp. 11.739.915,00 |